The Flower Blog

It’s Been a Long Road, and We’ve Come Full Circle

Posted by Sun, Nov 15, 2026 @ 04:15 PM

KSBADGE_25-02And yes, we absolutely mean the roundabout.

After months of construction at 10th Street and Raceway Road, that feels like a pretty good description of how we got here. There were barricades, changing entrances, gravel and days when it seemed like the orange cones might become permanent members of our staff.

But there were also customers who kept coming. People who cheered us on. A hardworking construction crew who became familiar faces. And two bulldogs who made sure nobody took anything too seriously for too long.

Our own Heather shared six reasons we kept our sense of humor through construction. Looking back, they all come down to the people—and paws—who helped us keep going.


847420143_4364937127150348_5536966371694512958_n1. You Kept Finding Your Way to Us

Sometimes literally.

You navigated detours, figured out changing entrances and called to ask how to get into the parking lot. Then you came anyway.

You picked up flowers, ordered gifts, stopped in to browse and continued trusting us with your birthdays, anniversaries, celebrations and hard days. Some visits took more effort than they should have, and we know you had other options.

You chose to keep supporting us. We felt that every day.

2. You Helped Us Keep Our Sense of Humor

We practiced what Heather called “radical acceptance.” We couldn’t speed up the machinery or rearrange the construction schedule. Apparently, being very good at arranging things only gets you so far.

Some days, we could laugh about it. Other days, we had to work a little harder at that part.

Your encouragement helped. Every friendly conversation, shared joke and “Hang in there!” reminded us that you were rooting for us. When the project seemed never-ending, those little moments made a difference.

846168251_1464037322262885_6594285563909295011_n3. We Had Something to Look Forward To

We spent a lot of time imagining the day we could give directions without mentioning a barricade.

Easier access. A finished intersection. Customers arriving without having to wonder whether they’d found the right entrance.

Now that the roundabout is open, we’re finally seeing that part come together. There’s still finishing work to be done, but getting to this point feels good.

If you’ve been following along with us, you probably understand why we’re so excited about a road.

4. Minnie Pearl and Izzy Mae Kept Morale Up

Our unofficial construction inspectors had a busy season.

Minnie Pearl and Izzy Mae kept an eye on the activity, greeted visitors and provided a steady supply of reasons to smile. We can’t say they contributed much to the paving, but their work in customer relations deserves recognition.

Sometimes you need an encouraging word. Sometimes you need a bulldog face looking at you like the most pressing issue of the day is whether someone has a treat.

They helped. A lot.

846809360_1459258519461178_4696934238915555004_n5. The People Outside Our Doors Became Part of Our Day

Over time, we got to know the hardworking people behind the equipment, cones and construction updates.

We appreciated their efforts, the conversations along the way and the chance to make new friends in the middle of all that activity. They were working through a big project right outside our doors while we kept working inside.

To the crew: thank you for your hard work and for helping us get to the other side of this.

6. We Had So Many Reasons to Keep Going

Our staff kept showing up and adjusting. Customers kept ordering. Neighbors kept encouraging us. Friends checked in. The dogs continued their very important supervisory work.

The construction felt long because it was long. We had frustrating days, and we won’t pretend otherwise.
But we also had so many reminders of the support surrounding this little flower shop.

Every order, visit, kind word and bit of patience helped carry us through.

Thank You for Staying With Us

Gillespie Florists has been serving Indianapolis since 1895 and has remained under current family ownership for more than 65 years. That history is made up of relationships with people who trust us, support us, and keep coming back.

These past few months reminded us of that.

Thank you for braving the cones. For cheering us on. For laughing with us when there wasn’t much else to do about the situation. For making an inconvenient trip because you wanted to shop with us.

It’s been a long road, and we’ve come full circle.

We’re so grateful you stayed with us for the trip. 💐🐾

Topics: roundabout, 10th and Raceway, construction

10th & Raceway Roundabout: Frequently Asked Questions

Posted by Sun, May 31, 2026 @ 02:59 PM

KSBADGE_25-02Construction at 10th & Raceway continues, and we know it can look a little intimidating from the road—but we promise, we are still here, open, and serving you with the same care and creativity as always. Here’s everything you need to know to find us with ease.


Are we still open during construction?

Yes! Gillespie Florists is fully open and operating as usual.
Our designers are in the shop creating fresh arrangements every day, and our delivery drivers are out on the road keeping celebrations, sympathies, and everyday moments on schedule.


IMG_8026-1The signs say “Road Closed.” Can I still get to you?

Yes, you can.

Those “Road Closed” signs are intended for thru-traffic—drivers trying to pass through the area to reach another destination. If you are coming to visit us, you are considered local traffic, which means you are allowed to drive past the barricades to reach our shop and parking lot.

If it feels uncertain the first time, you’re not alone—but you are in the right place.


Which entrance should I use today?

Access may shift depending on active construction zones and crew activity.

As of March 24, 2026:

  • OPEN: 10th Street Entrance (best accessed by heading west from Country Club Road)
  • CLOSED: Raceway Road Entrance

Please note: this can change quickly. If one route is blocked, the other is typically your best alternative.


IMG_8028-1Are your hours still the same?

Yes—our regular business hours have not changed.
You can always check our most current hours on our website or give us a quick call if you’re unsure.


Can I still get delivery instead of coming in?

Absolutely—and it’s a great option while construction is ongoing.

If you’d prefer to avoid the area altogether, we recommend placing your order online or by phone. Our delivery team is navigating the detours daily and knows the surrounding routes better than anyone.

Flowers will still get where they need to go—beautifully and on time.


How can I get the most up-to-date route information?

Construction shifts quickly, and we’re happy to help you navigate it in real time.

For the most current “route of the hour,” reach out anytime:

We’re always glad to help you get here with less stress and more ease.


Topics: roundabout, construction

Navigating the Roundabout Construction!

Posted by Mon, Jul 28, 2025 @ 10:00 AM

              

 

 

Heads up, flower fans! Our intersection is getting a fantastic upgrade with a new roundabout installation scheduled to begin on or after August 1st and expected to be completed by November 15th. While this means some changes to your usual route, we want to assure you that Gillespie Florists will be OPEN FOR BUSINESS throughout the entire project!

We understand construction can be a bit tricky, so here's what you need to know:

  • We're Open & Accessible: Both of our parking lot entrances will remain accessible. There will be temporary, periodic closures to individual entrances, but never simultaneously, so you'll always have a way in!

  • Navigating the Closures:

    • No Access From the West or North: If you're coming from the west (via 10th Street traveling east from Ronald Reagan Pkwy) or from the north (via Raceway Road traveling south from 21st Street), the intersection will be closed.

    • Accessing Our Southwest Entrance: Please use northbound Raceway Road (traveling north from Rockville Road).

    • Accessing Our Northeast Entrance: Please use westbound 10th Street (traveling west from Country Club Road).

  • "Road Closed" Barricades: You'll see "Road Closed 1 Mile Ahead" barricades at the intersections of Country Club Road and 10th Street, and Raceway Road and Rockville Road. Please note: Traffic is permitted past these barricades to gain access to Gillespie Florists (they will say "open to local traffic").

  • During Construction: If one of our entrances is temporarily blocked, all traffic will be directed to utilize the alternate entrance.

We'll be using our social media, email, text messaging, plus local and in-store signage to keep you updated with the latest access information.

Questions or Need Help? Don't hesitate to reach out!

 

Topics: Gillespie Florists, Indianapolis, Shopping local, local florist, roundabout, 10th and Raceway, construction